SYSTEM ONLINENODES: 142ALARMS: 0 CRIT / 1 WARN ИТП-04 · T off8 (771) 493-00-5009:42:17
Home / Projects / Green Mall Shopping Center — Fire Suppression

Green Mall Shopping Center — Fire Suppression

Installation and automation of the shopping center's fire suppression systems: pump units, control cabinets, automatic standby switchover, motor protection, commissioning.

CLIENT Green Mall Shopping CenterDURATION 12 daysTYPE Retail

At the Green Mall shopping center, Atlas Scada carried out a full scope of work to install and automate the fire suppression systems, including startup and commissioning.

Survey and preparation

Our specialists inspected the shopping center's premises, pump rooms and engineering areas, reviewed the design documentation, and defined the equipment configuration and system operating logic in line with the facility's purpose and regulatory requirements.

Equipment installation

  • Fire suppression pump units.
  • Shut-off and control valves.
  • Instrumentation and metering devices.
  • Pressure and system-status sensors.

Automation and control functions

  • Automatic and manual pump control.
  • Pipeline pressure monitoring.
  • Automatic activation of standby equipment.
  • Electric motor protection.
  • Alarm signaling for fault and emergency conditions.

Cable runs

Power and signal cables were laid between the pump stations, control cabinets and sensors; all lines were labeled and checked for integrity and correct connection.

Commissioning works

  • Verification of the automation operating algorithms.
  • Tuning of pressure parameters and setpoints.
  • Testing of pump startup modes.
  • Verification of redundancy and emergency scenarios.

Result

The fire suppression systems were commissioned and now provide reliable, uninterrupted operation that meets fire-safety requirements for facilities with large public occupancy. Project duration — 12 days.