Prosecutor General's Office of the RK — heating substations
Reconstruction of heating substations with a full replacement of automation: automatic control of coolant temperature, protective algorithms, and connection to dispatch monitoring.
As part of modernizing the engineering systems of the Prosecutor General's Office of the Republic of Kazakhstan, Atlas Scada carried out the reconstruction of the heating substations with a full replacement of the outdated automation. The goal was to improve the reliability of heat supply, the stability of temperature regimes, and to reduce operational risks during the heating season.
What the inspection revealed
- The automation did not provide precise control of coolant parameters.
- Part of the equipment was heavily worn, and control was carried out mostly manually.
- There was no automatic protection against emergency conditions.
- Coolant temperature was maintained unstably, and monitoring and diagnostic capabilities were limited.
Technical solutions
- Automatic control of coolant temperature.
- Installation of modern temperature and pressure sensors.
- Protective algorithms for equipment operation.
- The option of future connection to a dispatch monitoring system.
What we did
- Dismantled the outdated control and regulation components.
- Installed new equipment: controllers, actuators for the control valves, coolant parameter sensors, and control cabinets built on a modern component base.
- Performed the work without a prolonged shutdown of the building and while preserving the existing utilities.
- Programmed the controllers and configured the control algorithms accounting for transient conditions, protection against deviations, and stability under changing load.
- Carried out commissioning with a step-by-step verification of all operating modes.
Result
- Stable automatic maintenance of the set temperature parameters.
- Reduced influence of the human factor.
- Improved reliability and safety of heat supply.
- Transparent and manageable operation of the engineering systems, ready for further gains in energy efficiency.
Project duration — 6 days.

Quryq Port — Marine Firefighting System
Restoration of a 2×140 kW pump station, zoned automatic suppression, foam fire suppression for the railway tracks, dispatch integration with the fire brigade, and redundant control.

Astana Arena — Fire Suppression System
Restoration with replacement of outdated automation: new control cabinets, controllers, protection algorithms, and integration with the fire alarm system.

Green Mall Shopping Center — Fire Suppression
Installation and automation of the shopping center's fire suppression systems: pump units, control cabinets, automatic standby switchover, motor protection, commissioning.